{"id":2875,"date":"2022-02-21T06:44:22","date_gmt":"2022-02-21T14:44:22","guid":{"rendered":"https:\/\/cf.iisd.net\/savi\/?post_type=savi-project&#038;p=2875"},"modified":"2024-04-19T03:34:02","modified_gmt":"2024-04-19T10:34:02","slug":"albania-tirana-durres-railway-overview%e2%80%8b","status":"publish","type":"savi-project","link":"https:\/\/www.iisd.org\/savi\/project\/albania-tirana-durres-railway-overview%e2%80%8b\/","title":{"rendered":"ALBANIA, TIRANA\u2013DURRES RAILWAY"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">This project consists of the&nbsp;rehabilitation of Tirana\u2013Durres&nbsp;train line and extension of the train line&nbsp;to the Tirana International airport. The&nbsp;total cost of the project is EUR 92&nbsp;million. A European Bank for Reconstruction and Development loan of EUR 36.87&nbsp;million will co-finance the construction&nbsp;phase. The project is managed by&nbsp;Albanian Railways.\u200b<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We will estimate avoided travel volume&nbsp;and time, reduced energy consumption,&nbsp;lowered CO<sub>2<\/sub>&nbsp;and pollutants emissions, direct&nbsp;and indirect employment creation, and&nbsp;human health benefits.\u200b<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project consists of the&nbsp;rehabilitation of Tirana\u2013Durres&nbsp;train line and extension of the train line&nbsp;to the Tirana International airport. The&nbsp;total cost of the project is EUR 92&nbsp;million. A European Bank for Reconstruction and Development loan of EUR 36.87&nbsp;million will co-finance the construction&nbsp;phase. The project is managed by&nbsp;Albanian Railways.\u200b We will estimate avoided travel volume&nbsp;and time, reduced&#8230;  <a class=\"excerpt-read-more\" href=\"https:\/\/www.iisd.org\/savi\/project\/albania-tirana-durres-railway-overview%e2%80%8b\/\" title=\"Read ALBANIA, TIRANA\u2013DURRES RAILWAY\">Read more &raquo;<\/a><\/p>\n","protected":false},"author":15,"featured_media":2849,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"project_cat":[71,2],"class_list":["post-2875","savi-project","type-savi-project","status-publish","has-post-thumbnail","hentry","project_cat-sustainable-transport","project_cat-transportation"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project\/2875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project"}],"about":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/types\/savi-project"}],"author":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/comments?post=2875"}],"version-history":[{"count":0,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project\/2875\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/media\/2849"}],"wp:attachment":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/media?parent=2875"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/project_cat?post=2875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}