{"id":2420,"date":"2020-06-30T09:44:23","date_gmt":"2020-06-30T16:44:23","guid":{"rendered":"http:\/\/iisd.org\/savi\/?post_type=savi-project&#038;p=2420"},"modified":"2021-07-08T09:01:46","modified_gmt":"2021-07-08T16:01:46","slug":"c3s-use-case-hydropower-in-tanzania","status":"publish","type":"savi-project","link":"https:\/\/www.iisd.org\/savi\/project\/c3s-use-case-hydropower-in-tanzania\/","title":{"rendered":"C3S Use Case: Hydropower Project in Tanzania"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.iisd.org\/publications\/savi-kakono-hydropower-plant-tanzania\"><img loading=\"lazy\" decoding=\"async\" src=\"\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-846x1200.jpg\" alt=\"\" class=\"wp-image-2776\" width=\"321\" height=\"455\" srcset=\"https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-846x1200.jpg 846w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-212x300.jpg 212w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-768x1089.jpg 768w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-1083x1536.jpg 1083w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-1444x2048.jpg 1444w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-106x150.jpg 106w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-317x450.jpg 317w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-423x600.jpg 423w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-635x900.jpg 635w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-1692x2400.jpg 1692w, https:\/\/www.iisd.org\/savi\/wp-content\/uploads\/2020\/06\/savi-kakono-hydropower-plant-tanzania-cover-scaled.jpg 1805w\" sizes=\"auto, (max-width: 321px) 100vw, 321px\" \/><\/a><figcaption><sub>Click on the image to access the SAVi report.<\/sub><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<h5 class=\"wp-block-heading\" id=\"block-2d77fb03-1230-4c49-9b82-c4a2f84f2828\">The Government of Tanzania, through the Tanzania Electric Supply Company Limited (TANESCO), is proposing to build the Kakono Hydropower Plant along the Kagera River in the northern country. The valuation of the economic, environmental, and social externalities resulting from this project require best-in-class climate data, which is being provided by the Copernicus Climate Change Service (C3S).<\/h5>\n\n\n\n<p class=\"wp-block-paragraph\" id=\"block-f91ccfe3-d328-4378-a558-7e386bf3a2b4\">This C3S data also provides vital insights into what climate-related risks this Hydropower Project will face, and what it will mean for its financial performance over its life cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" id=\"block-d7172d1a-f900-475a-b385-c1302ce77e80\"><strong>Read the SAVi report <\/strong><a rel=\"noreferrer noopener\" href=\"https:\/\/www.iisd.org\/publications\/savi-kakono-hydropower-plant-tanzania\" target=\"_blank\"><strong><em>A Sustainable Asset Valuation of the Kakono Hydropower Plant in Tanzania<\/em><\/strong>: <em><strong>Assessing Climate Risks and Externalities of Hydropower and Energy Generation Alternatives.<\/strong><\/em><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" id=\"block-06d957cb-0b0b-4c9e-ac17-b7412c092000\">Our assessment involved an integrated cost-benefit analysis of the project; a valuation of co-benefits, avoided costs, and societal costs; a demonstration of how climate risks will affect the project\u2019s financial performance, derived from C3S data; and how sustainable assets perform in the energy sector in Tanzania, relative to diesel generators or other traditional technologies. It also considers the hydropower project against the costs and benefits of a hypothetical energy generation scenario that ensures the provision of the same amount of electricity annually and entails electricity generated by solar photovoltaic systems.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<p class=\"wp-block-paragraph\"> <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>This C3S data also provides vital insights into what climate-related risks this Hydropower Project will face, and what it will mean for its financial performance over its life cycle.<\/p>\n","protected":false},"author":4,"featured_media":2768,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"project_cat":[4,6],"class_list":["post-2420","savi-project","type-savi-project","status-publish","has-post-thumbnail","hentry","project_cat-energy","project_cat-hydropower"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project\/2420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project"}],"about":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/types\/savi-project"}],"author":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/comments?post=2420"}],"version-history":[{"count":0,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/savi-project\/2420\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/media\/2768"}],"wp:attachment":[{"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/media?parent=2420"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/www.iisd.org\/savi\/wp-json\/wp\/v2\/project_cat?post=2420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}