{"id":302,"date":"2009-09-28T06:18:00","date_gmt":"2009-09-28T11:18:00","guid":{"rendered":"http:\/\/itn.mattrock.ca\/2009\/09\/28\/ad-hoc-committee-confirms-argentina-is-on-the-hook-to-azurix-for-us165-million\/"},"modified":"2013-02-01T04:48:22","modified_gmt":"2013-02-01T10:48:22","slug":"ad-hoc-committee-confirms-argentina-is-on-the-hook-to-azurix-for-us165-million","status":"publish","type":"post","link":"https:\/\/www.iisd.org\/itn\/2009\/09\/28\/ad-hoc-committee-confirms-argentina-is-on-the-hook-to-azurix-for-us165-million\/","title":{"rendered":"Ad Hoc Committee confirms Argentina is on the hook to Azurix for US$165 Million"},"content":{"rendered":"<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span><strong>By Elizabeth Whitsitt<br \/>\n2 October 2009 <\/strong><\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Marking a final setback for Argentina in its protracted dispute with US-based water services firm Azurix Corp, on 1 September 2009 an ad hoc committee denied Argentina\u2019s application to annul an <span class='tooltipsall tooltipsincontent classtoolTips18'>ICSID<\/span> tribunal\u2019s previous decision awarding Azurix approximately US$165 Million for breach of Argentina\u2019s obligations under the US-Argentina Bilateral Investment Treaty.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Problems between the US-based firm and Argentina began almost a decade ago when Azurix acquired the exclusive right to operate a water and sewage utility concession in the Argentine Province of Buenos Aires for a 30 year period. Less than a year after commencing operations in Argentina, concerns over water quality linked to the presence of algae was raised. As a result, the Province\u2019s water regulator ordered Azurix not to charge customers for water for a number of weeks in 2000 and to pay for its failure to maintain certain water-quality standards. <\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>In response, Azurix denied liability and claimed that the conditions resulting in the algae outbreak pre-dated its acquisition of the Concession. Specifically, Azurix alleged that liability lay with the provincial authorities who improperly constructed and maintained the water treatment system required for algae removal.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Subsequently, Azurix commenced arbitral proceedings against Argentina based upon the alleged violation of several articles of the US-Argentine <span class='tooltipsall tooltipsincontent classtoolTips63'>BIT<\/span>. In its claim, Azurix contended that: (i) Argentina\u2019s treatment of Azurix\u2019s investment was tantamount to expropriation, (ii) Argentina failed to provide fair and equitable treatment, and full protection and security to Azurix\u2019s investment, and (iii) Argentina did not observe the obligations that it had entered into with respect to Azurix\u2019s investment, had acted arbitrarily, and did not act transparently. <\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>On 14 July 2006 the ICSID Tribunal unanimously found Argentina liable to Azurix on the basis of the latter two grounds.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Five months later, Argentina sought to annul that award. Under sub-paragraphs (a), (b), (d) and (e) of Article 52(1) of the <span class='tooltipsall tooltipsincontent classtoolTips1'>ICSID Convention<\/span>, Argentina identified numerous matters which it claimed were grounds for annulment, relating to the Tribunal\u2019s jurisdictional findings, to its findings relating to the applicable law, to its consideration of evidence, to the constitution of the Tribunal, as well as to the Tribunal\u2019s calculation of the damages.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>In considering those arguments the ad hoc committee was clear that \u201c[a]n ICSID award is not subject to any appeal or to any other remedy except those provided for in the ICSID Convention.\u201dAs a result, the ad hoc committee noted that it \u201cis not a court of appeal, and cannot consider the substance of the dispute, but can only determine if the Tribunal\u2019s award should be annulled on one of the grounds delineated in Article 52(1) of the ICSID Convention.\u201d<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Having so characterized its role, the ad hoc committee proceeded to reject all of Argentina\u2019s arguments for annulment. In so doing, the committee confirmed that the standard of review applicable to all of Argentina\u2019s arguments is very high, thus making successful annulment applications under the ICSID Convention extremely rare.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>One example of the ad hoc committee\u2019s reasoning in this regard can be seen in its consideration of arguments raised by Argentina that the Tribunal was not properly constituted, within the meaning of Article 52(1)(a) of the ICSID Convention.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>In earlier proceedings Argentina attempted to have Dr. Rigo Sureda, the President of the Tribunal, disqualified pursuant to Articles 57 and 14(1) of the ICSID Convention. Citing Dr. Rigo Sureda\u2019s relationship with a Houston law firm hired as counsel for foreign investors in other ICSID arbitrations, Argentina contended that Dr. Rigo Sureda was \u201cimmersed in various conflicts of interest\u201d which \u201ccast reasonable doubts on his impartiality.\u201d These arguments were rejected by the other two members of the Tribunal who determined that Argentina\u2019s application for disqualification failed on both procedural and substantive grounds.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>In the subsequent annulment application, Argentina challenged this decision by contending that the Tribunal was not properly constituted, on account of the fact that \u201cit was not possible for an objective observer to be confident that [Dr. Rigo Sureda] could be relied upon \u2018to exercise independent judgment\u201d. In rejecting Argentina\u2019s argument, the ad hoc committee notes that \u201cArticle 52(1)(a) cannot be interpreted as providing the parties with a de novo opportunity to challenge members of the tribunal after the tribunal has already given its award. A Committee would only be able to annul an award under Article 52(1)(a) if there had been a failure to comply properly with the procedure for challenging members of the tribunal set out in other provisions of the ICSID Convention.\u201d<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-family: andale mono,times; font-size: small;\"><span>Accordingly, a ground of annulment might exist under Article 52(1)(a) if an application for disqualification was made but not decided before an ICSID award was given, or if a decision on an application for disqualification was purportedly heard by a person or body other than an appropriate person or body prescribed by Article 58 of the ICSID Convention. Barring such manifest procedural errors, however, it seems clear that an ICSID tribunal decision is final and binding, not subject to further review pursuant to an annulment application.<\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span><span style=\"font-size: small;\"><span><span><span style=\"font-family: andale mono,times;\"><em>Decision on the Application for Annulment of the Argentine Republic, Azurix Corp. v. The Argentine Republic, ICSID Case No. ARB\/01\/12<\/em> (United States\/Argentina BIT), is availabe here: <\/span><\/span><a href=\"http:\/\/ita.law.uvic.ca\/documents\/Azurix-Annulment.pdf\"><span style=\"font-family: andale mono,times;\">http:\/\/ita.law.uvic.ca\/documents\/Azurix-Annulment.pdf<\/span><\/a><\/span><\/span><\/span><\/p>\n<p class=\"MsoNormal\"><span style=\"font-family: Times New Roman;\"><span style=\"font-size: small;\"><span>\u00a0<\/span><\/span><\/span><\/p>\n<script type=\"text\/javascript\"> toolTips('.classtoolTips1','Convention on the Settlement of Investment Disputes between States and Nationals of Other States'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips18','International Centre for Settlement of Investment Disputes'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips63','Bilateral investment treaty'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips65','East African community'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips67','Energy Charter Treaty'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips72','Investment Court System'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips100','investissement direct \u00e9tranger'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips104','responsabilit\u00e9 sociale des entreprises'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips104','responsabilit\u00e9 sociale des entreprises'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips106','asociaci\u00f3n p\u00fablica-privada'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips110','inversi\u00f3n extranjera directa'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips114','Sistema de Tribunales de Inversiones'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips116','European Commission'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips118','Union europ\u00e9enne'); <\/script><script type=\"text\/javascript\"> toolTips('.classtoolTips119','Uni\u00f3n Europea'); <\/script>","protected":false},"excerpt":{"rendered":"<p>By Elizabeth Whitsitt 2 October 2009 Marking a final setback for Argentina in its protracted dispute with US-based water services firm Azurix Corp, on 1 September 2009 an ad hoc [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":15869,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[2061,1924,2059,2085],"class_list":["post-302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-itn","tag-annulment","tag-icsid","tag-infrastructure","tag-natural-resources"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/posts\/302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/comments?post=302"}],"version-history":[{"count":0,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/posts\/302\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/media\/15869"}],"wp:attachment":[{"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/media?parent=302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/categories?post=302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iisd.org\/itn\/wp-json\/wp\/v2\/tags?post=302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}